| Country | Work | Duration | Size |
| Slovenia | Replacing the furnace with a heat pump. Supply, installation and commissioning of heat pumps - Toshiba // Cooling systems (ceiling cooling, concrete core activation, modular ceiling system) | 2021 – | Usable area: |
| Country | Work | Duration | Size |
| Slovenia | Replacing the furnace with a heat pump. Supply, installation and commissioning of heat pumps - Toshiba // Cooling systems (ceiling cooling, concrete core activation, modular ceiling system) | 2021 – | Usable area: |